GPP Scheduled Task Fails in Group Policy Modeling depending on DC

$
0
0

We have multiple domain controllers running at a 2003 functional level.

We have 1 DC running Server 2003 x86 SP2 and the rest run Server 2008 (maybe R2)

I created a GPO that includes a Scheduled Task Group Policy Preference under Computer Configuration.

In order to test this I used Group Policy Modeling in the GPMC on a 2008 R2 Machine where I am editing Group Policy.

If I run the modeling (perform the simulation on the 2003 DC it fails. (Note I am modeling the GPO for a different computer, not the 2003 SP2 DC, I am running the modeling for a Workstation)

If I run the modeling against a 2008 DC it works fine.

Per the instructions on the Summary Tab regarding the scheduled task failure I look at the event log on the 2003 domain controller and this is what i find.

The event I get on the 2003 DC is 8196 and I will place the details below.

Event Type:   Error

Event Source:           Group Policy Scheduled Tasks

Event Category:        Disk

Event ID:       8196

Date:              2/27/2014

Time:             4:48:47 PM

User:              NT AUTHORITY\SYSTEM

Computer:     <computername>

Description:

The client-side extension caught the unhandled exception '0xC0000005' inside: 'threadEntry : client main' See trace file for more details. For more information, see Help and Support Center at http://go.microsoft.com/fwlink/events.asp.

So, should I be concerned that this is failing on the 2003 DC, does this mean that if my workstations authenticate to my 2003 DC that the preference will not process?

I was reading that in 2003 client side extensions were not there and can be installed, would this make the modeling succeed?