Quantcast
Channel: Group Policy forum
Viewing all articles
Browse latest Browse all 19997

Group Policy Preference - Scheduled Task - Daylight Savings...

$
0
0

I was almost certain that I have posted about this before - I have read plenty on the topic.

Problem - On Windows XP SP3, when using GPP to create Scheduled Tasks on a machine, when Daylight Savings time hits, the schedule is off by 1 hour.  This is because the GPP schedules the task based on UTC time, which is unchanged by DST.

That being said - all of my machines are now Windows 7 Embedded.  I thought for sure that I had read somewhere that this issue was resolved in Windows 7 OR throught a patch / hotfix had been released to resolve this issue.  

I am seeing some of my machines report correct times, and some are reporting incorrect times.  The incorrect times are bumped ahead by 1 hour.

Can someone point me in the right direction for any KB or documentation on this?  I have read over KB2738974 and also installed this hotfix on these machines.  I am pretty confused why my results are not consistent.

Any direction is greatly appreciated.

Thanks, 

sb


Viewing all articles
Browse latest Browse all 19997

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>